中亚天然气通过C线运送到中国Natural gas transported through the newly constructed Line C of the China-Central Asia gas pipeline network successfully reached the Horgos Port in northwest China's Xinjiang on Sunday. This milestone signals that Line C is ready to go into full operation.
Line C is over 1,800 kilometers long and runs parallel to lines A and B. As China’s first large international pipeline for imported natural gas, the China-Central Asia line starts at the Turkmenistan-Uzbekistan border before passing through central Uzbekistan and southern Kazakhstan before entering China.
From Horgos in Xinjiang, the pipeline then connects with China’s West-East pipelines, to deliver natural gas across the country.